Contact Us

Door systems for today’s demands

We work with Colchester Borough Homes (CBH) where we replace failing timber doors with steel units.

On one occasion, we replaced the old timber door at Grymes Dyke Court with a fully automated EVO door system.

This building is part of Colchester’s sheltered housing scheme for the elderly and vulnerable and the following considerations were taken into account: security, compliance to DDA regulations including full automation, integration with the existing door entry system, uninterrupted power supply (UPS) in case of a power cut and ease of use by visitors as well as residents. Having met all criteria, FSM became, and still are, the door manufacturer of choice for CBH.

Grymesdyke before
Grymesdyke after

Do you have a question?

What's new at FSM?

FSM has left its name across a range of sectors from retail to construction with every project that we complete, our expertise continues to grow. Click on the button below to browse through our history of delivering a diverse range of services and products and of our sheet metal manufacturing capabilities.

Our latest investment

A new press brake has arrived

Read Article

Regenerated waste re-cycling centre

FSM are requested to remake and replace the damaged equipment.

Read Article

New lifting equipment for our Laser

Our laser machine receives a new assistant to help take the strain

Read Article

FSM’s entry into sustainable mobility. Our first electric vehicles.

Reflecting the growing shift towards sustainable transportation and reflecting our green policy.

Read Article

Pad-lockable fireman and emergency access control switch units

Following requests, we have designed pad-lockable fireman and emergency access control switch units.

Read Article

A unique project and somewhere to sit at an art exhibition in Paris

We were invited by Alexandra Gerber to join a program in producing three, artistically designed aluminium...

Read Article

Summer Newsletters have gone out to our customers.

FSM's commitment to improving and maintaining cutting-edge capabilities drives every decision we make.

Read Article

Our new machine arrives from Germany. As expected, right on time!

Once again, Trumpf perform to expectations and deliver our new machine on time.

Read Article

Following an invitation from Trumpf, FSM visit their Intech 2023 exhibition

Mark Casey & Danny Walker flew to Stuttgart to attend Intech 2023 at Trumpf HQ in Ditzingemn, Germany.

Read Article

March saw the approval of the latest version on the EVO door system

FSM have once again been awarded SBD certification for the year ahead.

Read Article

Our flexibility saw us venture in a different direction: Building Bridges.

Having confidence in our versatility, we were tasked with producing a new route to and from a residential...

Read Article

On Thursday November 10th 2022, our latest machine arrives.

We needed a more up to date saw to improve productivity and maintain accuracy.

Read Article

In an effort to improve productivity, we are investing in a new press brake

FSM has taken the plunge and ordered a new Trumpf Trubend 5130 press brake.

Read Article

Having decided to update our image, FSM's new website goes live.

Following many months of working and re-working, FSM launch an entirely new website complete with a brand...

Read Article

Creating a Water Feature

While wandering around an "Open Garden" event recently, we stumbled across a project we were involved with...

Read Article

FSM implement upgrade for the EVO range of mild steel doors and screens

Following feedback from customers, installation teams & production staff, we have implemented changes to...

Read Article

FSM travel to Bolton to replace a communal entrance.

Following an arson attack on a housing estate in Bolton, FSM were tasked with replacing the communal...

Read Article

FSM's recently launched Green policy initiative takes off.

Solar panels are installed to boost our initiative and prove a massive success.

Read Article

Out with the old and in with the new. Good to go!!

Following the decommissioning of our old laser, the new one is in and fully operational.

Read Article